Time Lapse In Which A Causasic Handyman Places The Insulating Panels On The Old Floor To Make The Laying Base Of The Laminated Wooden Platform The Panels Are Joined With Aluminum Adhesive TapeÂ
The Caucasian handyman places the new gray laminated wood plank on the edge of the one already on the floor. With the wooden block and the hammer fixed it, check with your finger the perfect closure.